Removal
1. Disconnect the battery cable terminals, remove the air filter, and then the battery.
2. Move the air conditioner refrigerant tank 1 to the side without opening the circulation circuit (see illustration).
7.2 Move the air conditioner refrigerant tank 1 to the side without opening the circulation circuit
3. Release the wires secured to the battery tray 2 from the holders, disconnect and move aside (see illustration 7.2).
Attention! To ensure correct laying of wires after installation of the tray, it is recommended to mark their position and attachment points (see illustration 7.3).
7.3 Wires and their holders on the battery tray 2
A - support bracket
B - harness holder 4
C - harness holder 5
D - holder of harnesses 6 and 7
E - holder of harnesses 5 and 7
G - harness holder 9
H - harness holder 8
I - harness holder 9
J - harness holder 9
K - Pipeline Holder 10
F - refrigerant tank mounting location
4. Unscrew the bolt under the tray and remove the tray.
The tray is installed in the reverse order of its removal.
