2. Drain the engine oil.
3. Remove the clutch cover.
4. Lock the flywheel with a thrust shoe «A», whose catalog number is 0153-ZX (see illustration).
9.4 Lock the flywheel with the thrust shoe «A», whose catalog number is 0153-ZX
5. Disconnect the plug of the power wire from the air conditioning compressor.
Attention! All work related to the air conditioner should be entrusted to a specialized workshop. Do not open the refrigerant circuit yourself - risk of frostbite!
6. Move away from the place of work the compressor 1 of the air conditioner together with the bracket, without disconnecting the hoses from the compressor (see illustration).
9.6 Move away from the place of work the compressor 1 of the air conditioner together with the bracket, without disconnecting the hoses from the compressor
7. Remove the front A/C compressor mounting bracket.
8. Remove the stop that was used to block the crankshaft when removing the timing belt.
9. Unscrew the bolt 2 and remove the gear 3 from the crankshaft (see illustration). Bolt 2 tightening torque:
- 1st pass - 40 Nm;
- 2nd pass - tighten the bolt 360°.
9.9 Unscrew bolt 2 and remove gear 3 from the crankshaft
10. Remove the tension roller 4 (see illustration 9.9).
11. Remove the oil pump 5, remove the pump gasket (see illustration 9.9).